b'OPPORTUNITY LIVES HERESite Details12th Street Connector AreaInfrastructure CharacteristicsTRANSPORTATIONAdjacent street Northeast Blvd.Adjacent street functional classification Minor ArterialAdjacent street ownership/maintenance responsibility StateTransit access Nearby bus stop served by one bus routeDriving distance to closest Interstate (approx.) 1.2 miles to I-49 5Driving distance to Port of Wilmington (approx.) 2.5 milesOn waterfront? YesSEWERSewer service provider City of WilmingtonWithin a combined sewer overflow sewer shed? YesSewer main type GravitySewer main diameter 111"WATERWater service provider City of WilmingtonLand Use and Environmental Characteristics Available capacity?** *Franklin Fibre-Lamitex Corporation,Water main diameter 12"Existing tenants (incomplete list) Telesonic Packaging POWERJurisdiction City of Wilmington Feeder Aggregate Capacity 3,000 kWZoning 26W-4 (Waterfront Residential/ Substation Transformer Aggregate Capacity 40,000 kWCommercial) BROADBAND PROVIDERTotal area (acres) 16.46 Verizon (Fiber) Partial Area CoverageNumber of parcels 19 Comcast (Cable) Partial Area CoverageAverage parcel size (acres) 0.87Note: All utility infrastructure analysis has been performed at a planning level with data provided by the relevant utility Number of owners 5 companies/providers.Information included in the analysis is based on the provided data as well as conversations held with individual companies/providers. It is up to future individual developers of each parcel to confirm adequate capacity of In an Opportunity Zone? Yes existing utilities based on each projects needs.*Cannot be determined based on available data. Percentage of land area in 100-year floodplain (approx.) 46% **Responses in this row are based on whether the site appears to have available capacity for most types of redevelopment/additional development, but not necessarily for redevelopment into a water-intensive use. As stated, it is the responsibility of Number of parcels containing Certified Brownfields 2 (total of 3 brownfields) future individual developers of each parcel to confirm adequate capacity of existing utilities based on each projects needs.Delaware Three Rivers Area Economic Development Master Plan 101'