b'OPPORTUNITY LIVES HERESite DetailsPurina BuildingInfrastructure CharacteristicsTRANSPORTATIONAdjacent street Edgemoor Ave.Adjacent street functional classification LocalAdjacent street ownership/maintenance responsibility City of WilmingtonTransit access Bus stop 0.5 miles away served by two bus routesDriving distance to closest Interstate (approx.) 2 miles to I-495Driving distance to Port of Wilmington (approx.) 4.1 milesOn waterfront? NoSEWERSewer service provider City of WilmingtonWithin a combined sewer overflow sewer shed? YesSewer main type GravitySewer main diameter 10"WATERWater service provider City of WilmingtonLand Use and Environmental Characteristics Available capacity?** *Existing tenants (incomplete list) NoneWater main diameter 8"New Castle County, City ofPOWERJurisdiction Wilmington Feeder Aggregate Capacity 3,000 kWZoning HI (Heavy Industrial), 26M-1 (LightSubstation Transformer Aggregate Capacity 29,250 kWManufacturing) BROADBAND PROVIDERTotal area (acres) 0.58 Verizon (Fiber) NoNumber of parcels 2 Comcast (Cable) YesAverage parcel size (acres) 0.29 Note: All utility infrastructure analysis has been performed at a planning level with data provided by the relevant utility Number of owners 1 companies/providers.Information included in the analysis is based on the provided data as well as conversations held with individual companies/providers. It is up to future individual developers of each parcel to confirm adequate capacity of In an Opportunity Zone? Yes existing utilities based on each projects needs.*Cannot be determined based on available data. Percentage of land area in 100-year floodplain (approx.) 0% **Responses in this row are based on whether the site appears to have available capacity for most types of redevelopment/additional development, but not necessarily for redevelopment into a water-intensive use. As stated, it is the responsibility of Number of parcels containing Certified Brownfields 1 future individual developers of each parcel to confirm adequate capacity of existing utilities based on each projects needs.Delaware Three Rivers Area Economic Development Master Plan 81'