b'OPPORTUNITY LIVES HERESite DetailsElectric Hose and Rubber Factory SiteInfrastructure CharacteristicsTRANSPORTATIONAdjacent street 12th St.Adjacent street functional classification Other Principal ArterialAdjacent street ownership/maintenance responsibility City of WilmingtonTransit access Nearby bus stop served by one bus rout eDriving distance to closest Interstate (approx.) 0.6 miles to I-495Driving distance to Port of Wilmington (approx.) 2.5 milesOn waterfront? YesSEWERSewer service provider City of WilmingtonWithin a combined sewer overflow sewer shed? YesSewer main type GravitySewer main diameter 24"WATERWater service provider City of WilmingtonLand Use and Environmental Characteristics Available capacity?** *Existing tenants (incomplete list) Chemical Equipment Labs; Delchem;Water main diameter 12"Furniture, Mattresses and More POWERJurisdiction City of Wilmington Feeder Aggregate Capacity 3,000 kWZoning 26W-1 (Waterfront Manufacturing) Substation Transformer Aggregate Capacity 31,250 kWTotal area (acres) 11.78 BROADBAND PROVIDERNumber of parcels 3 Verizon (Fiber) NoAverage parcel size (acres) 3.93 Comcast (Cable) NoNumber of owners 2 Note: All utility infrastructure analysis has been performed at a planning level with data provided by the relevant utility companies/providers.Information included in the analysis is based on the provided data as well as conversations held In an Opportunity Zone? Yes with individual companies/providers. It is up to future individual developers of each parcel to confirm adequate capacity of existing utilities based on each projects needs.Percentage of land area in 100-year floodplain (approx.) 95% *Cannot be determined based on available data. Number of parcels containing Certified Brownfields 1 **Responses in this row are based on whether the site appears to have available capacity for most types of redevelopment/additional development, but not necessarily for redevelopment into a water-intensive use. As stated, it is the responsibility of future individual developers of each parcel to confirm adequate capacity of existing utilities based on each projects needs.Broadband coverage area is adjacent to but does not overlap with the site of interest.Delaware Three Rivers Area Economic Development Master Plan 99'