b'OPPORTUNITY LIVES HERESite DetailsPort of WilmingtonInfrastructure CharacteristicsTRANSPORTATIONAdjacent street Christina Ave., Terminal Ave.Adjacent street functional classification Major Collector, Other Principle ArterialAdjacent street ownership/maintenance responsibility City of Wilmington, StateTransit access Nearby bus stop served by one bus routeDriving distance to closest Interstate (approx.) 0.7 miles to I-495Driving distance to Port of Wilmington (approx.) N/AOn waterfront? YesSEWERSewer service provider City of WilmingtonWithin a combined sewer overflow sewer shed? YesSewer main type GravitySewer main diameter 36"WATERWater service provider City of WilmingtonLand Use and Environmental Characteristics Available capacity?** *Existing tenants (incomplete list) Gulftainer USA Water main diameter 16"Jurisdiction City of Wilmington POWERZoning 26M-2 (General Industrial) Feeder Aggregate Capacity 3,000 kWTotal area (acres) 332.97 Substation Transformer Aggregate Capacity 30,667 kWNumber of parcels 11 BROADBAND PROVIDERAverage parcel size (acres) 30.27 Verizon (Fiber) NoNumber of owners 3 Comcast (Cable) NoNote: All utility infrastructure analysis has been performed at a planning level with data provided by the relevant utility In an Opportunity Zone? Yes companies/providers.Information included in the analysis is based on the provided data as well as conversations held with individual companies/providers. It is up to future individual developers of each parcel to confirm adequate capacity of Percentage of land area in 100-year floodplain (approx.) 46% existing utilities based on each projects needs.*Cannot be determined based on available data. Number of parcels containing Certified Brownfields 2 **Responses in this row are based on whether the site appears to have available capacity for most types of redevelopment/additional development, but not necessarily for redevelopment into a water-intensive use. As stated, it is the responsibility of future individual developers of each parcel to confirm adequate capacity of existing utilities based on each projects needs.Broadband coverage area is adjacent to but does not overlap with the site of interest.Delaware Three Rivers Area Economic Development Master Plan 87'